Skip to Content

IR Assets Auction and Demolishing, Yanbu, Saudi Arabia

The plant is divided into ZONES, and each zone consists of a list of units/equipment. ZONE 1 Aromatics Plant Tank Farm ZONE 2 Part of Aromatics Plant ZONE 3 Part of Aromatics Plant ZONE 4 1. Elevated Flare 2. Flare Pipelines ZONE 5 1. Utilities Plant 2. Pipe Rack (trench) ZONE 6 1. Central Workshop 2. Materials Warehouse 3. Chemical Warehouse ZONE 7 1. Purified Terephthalic Acid (PTA) 2. Crude Terephthalic Acid (CTA) ZONE 8 1. Acetic Acid Process Plant 2. Incinerator 3. Effluent Treatment Plants (ETP-II , ETP-III)

Documents:

0.00 SR 0.00 SR

  • Condition

Specifications

Condition Used